PRE DISCH. SURVEY:

This survey is made with pre-loading survey principles, the difference with pre-loading survey process is, it applied on cargos to be discharged. In this survey, in the begining of operation, during the operation every single day, whenever needed and in the end of the operation, reports will be made to share with the authorities.

With this survey, if the receiver of the cargo or the P&I club of the ship has a pre-loading report created during the loading, it is one of the surest ways to prevent time and money losses that may occur by detecting the cargoes that have problems or damage other than the remarks and notes included in this report or the loading documents.